Construction
for the Neptune Pool spanned 1924-1936. Three swimming pools
were built on this site, each successively larger. Initial
plans for the site called for a "Temple Garden" with an ornamental
pool and temple structure. On March 31, 1924, W.R. Hearst
wrote in a letter to Julia Morgan, "I am sending back the
plan of the temple garden with the suggestion that we make
the pool longer than it is, as long as a swimming pool. Mrs.
Hearst and the children are extremely anxious to have a swimming
pool!" On June 17, 1924, Morgan wrote that the first swimming
pool was nearing completion: "Mr. Neptune and the two ladies
can be placed but the finished basins will take some time
yet."
The
second version of the pool, a substantial enlargement, was
created in 1926-1927. This version had a series of concrete
steps at the southern side called the Cascade, down which
water flowed. The Neptune and Nereid statues, presently in
the temple pediment, then stood at the top of the Cascade.
The dressing rooms were begun in 1928 and furnished according
to Hearst's instruction.
The present version of the pool was under construction from
1934-1936. It is unlikely that the enlargement was done to
make it closer to Olympic size, as has sometimes been conjectured;
Olympic pools are 165 feet long. It is more likely that the
colonnades and Cassou statues, which were planned from the
late 1920's, required an enlarged treatment. Morgan anticipated
further modifications of the pool for Cassou's Neptune statuary
group to be placed in the small upper pool. On July 27, 1936,
Morgan wrote in a letter to Charles Cassou, "enclosed is a
plan and some photographs of the 'Neptune Pool' in its present
(uncompleted) state. The recess of the main pool and the small
pool above to receive your 'Neptune' group I have not touched
since my visit with you last year - so please do not think
of them except as something yet to be done to form a proper
background and sitting for your 'Venus' as well as your 'Neptune'
statuary." The "Neptune" sculpture group by Cassou intended
for the small upper pool was never installed.
The final version of the pool as it stands at the Castle today
is 104 feet long, 58 feet wide and 95 feet wide at alcove.
It is 3.5 feet deep at the west end, 10 feet at drains and
holds 345,000 gallons of water. Other unique aspects of the
Neptune Pool include the oil burning heating system, the light-veined
Vermont marble decorating the pools and colonnades, and four
17-century Italian bas-reliefs on the sides of the colonnades.
|
"Hearst Castle", "Hearst San Simeon State Historical Monument", "La Cuesta Encantada",
and "The Enchanted Hill" are registered trademarks of Hearst Castle®/California State Parks.
©2001, 2002, 2003, 2004, 2005, 2006, 2007 California State Parks, All rights reserved.
|